By Richard S. Brice, J. C. Browne
Communications of the ACM,
August 1978,
Vol. 21 No. 8, Pages 678-686
10.1145/359576.359587
Comments
Model studies of some integrated, feedback-driven scheduling systems for multiprogrammed-multiprocessor computer systems are presented. The basic control variables used are the data-flow rates for the processes executing on the CPU. The model systems feature simulated continuous-flow and preempt-resume scheduling of input-output activity. Attention is given to the amount of memory resource required for effective processing of the I/O activity (buffer space assignment). The model studies used both distribution-driven and trace-driven techniques. Even relatively simple dynamic schedulers are shown to improve system performance (as measured by user CPU time) over that given by optimal or near-optimal static schedulers imbedded in identical system structures and workload environments. The improvement is greatest under a heavy I/O demand workload.
The full text of this article is premium content
No entries found
Log in to Read the Full Article
Need Access?
Please select one of the options below for access to premium content and features.
Create a Web Account
If you are already an ACM member, Communications subscriber, or Digital Library subscriber, please set up a web account to access premium content on this site.
Join the ACM
Become a member to take full advantage of ACM's outstanding computing information resources, networking opportunities, and other benefits.
Subscribe to Communications of the ACM Magazine
Get full access to 50+ years of CACM content and receive the print version of the magazine monthly.
Purchase the Article
Non-members can purchase this article or a copy of the magazine in which it appears.