When you upload photos to Instagram, back up your phone to the cloud, send email through Gmail, or save a document in a storage application like Dropbox or Google Drive, your data is being saved in a datacenter. These datacenters are airplane-hangar-sized warehouses, packed to the brim with racks of servers and cooling mechanisms. Depending on the application you are using, you are likely hitting one of the datacenters operated by Facebook, Google, Amazon, or Microsoft. Aside from those major players, which I refer to as hyperscalers, many other companies run their own datacenters or rent space from a colocation center to house their server racks.

Carbon footprints. Most of the hyperscalers have made massive strides toward achieving carbon-neutral footprints for their datacenters. Google, Amazon, and Microsoft have pledged to decarbonize completely; however, none has yet succeeded in that quest.

If a company claims to be carbon neutral, this usually means it is off-setting its use of fossil fuels with renewable energy credits (RECs). A REC represents one MWh (megawatt-hour) of electricity that is generated and delivered to the electrical grid from a renewable energy resource such as solar or wind power. By purchasing RECs, carbon-neutral companies are essentially giving back clean energy to prevent someone else from emitting carbon. Most companies become carbon neutral by investing in offsets that primarily avoid emissions, such as paying people not to cut down trees or buying RECs. These off-sets do not actually remove the carbon the companies are emitting.

A net zero company actually must remove as much carbon as it emits. Though the company is still creating carbon emissions, those emissions are equal to the amount of carbon the company removes.

If a company calls itself carbon negative, it is removing more carbon than it emits each year. This should be the gold standard for how companies operate. None of the FAANG (Facebook, Apple, Amazon, Netflix, and Google) today claim to be carbon negative, but Microsoft issued a press release stating it would be by 2030.

Power usage efficiency, or PUE, is defined as the total energy required to power a datacenter (including lights and cooling) divided by the energy used for servers. A perfect PUE would be 1.0, since 100% of electricity consumption would be used on computation. Conventional datacenters have a PUE of about 2.0, while hyperscalers have gotten theirs down to about 1.2. According to a 2019 study from the Uptime Institute, which surveyed 1,600 datacenters, the average PUE was 1.67.

PUE as a method of measurement is a point of contention. PUE does not account for location, which means a datacenter that is located in a part of the world that can benefit from free cooling from outside air will have a lower PUE than one in a very hot climate. PUE should be measured as an annual average since seasons change and affect the cooling needs of a data-center over the course of a year. According to a study from the University of Leeds, "comparing a PUE value of data-centers is somewhat meaningless unless it is known whether it is operating at full capacity or not."

Google claims an average yearly PUE of 1.1 for all its datacenters, while individually some are as low as 1.08. One of the actions Google has taken for lowering its PUE is using machine learning to cool datacenters with inputs from local weather and other factors—for example, if the weather outside is cool enough the datacenter can use it without modification as free cold air. It can also predict windfarm output up to 36 hours in advance. Google took all the data it had from sensors in its facilities monitoring temperature, power, pressure, and other resources to create neural networks to predict future PUE, temperature, and pressure in its datacenters. This way Google can automate and recommend actions for keeping its datacenters operating efficiently from the predictions. Google also sets the temperature of its datacenters to 80°F, rather than the usual 68°F–70°F, saving a lot of power for cooling. Weather local to the datacenter is a huge factor. For example, Google's Singapore datacenter has the highest PUE and is the least efficient of its sites because Singapore is hot and humid year-round.

uf1.jpg
Figure. Google's datacenter in Eemshaven, Netherlands, has been powered entirely by renewable energy since the day it opened in late 2016.

Wired conducted an analysis of how Google, Microsoft, and Amazon stack up when comparing the carbon footprints of their datacenters. Google claims to be net zero for carbon emissions and publishes a transparency report of its PUE every year. While Microsoft claims it will be carbon negative by 2030, it is still carbon neutral today. It also claims to be pursuing 100% renewable energy by 2025.

Amazon, on the other hand, has the worst carbon footprint of the large tech companies. As noted previously, the location of the datacenter matters, so some Amazon regions might be greener than others because of the weather conditions in those areas or having more access to solar or wind energy. Amazon founder and CEO Jeff Bezos has pledged to get to net zero by 2040. Greenpeace seems to believe otherwise, claiming in a 2019 report that Amazon is not dedicated to that pledge since its Virginia datacenters were at only 12% renewable energy.

In 2018, Apple claimed 100% of its energy was from renewable sources. Facebook claims it will be at 100% renewable energy by the end of 2020. While U.S. companies have followed suit on pledging to lower their carbon footprints, Chinese Internet giants such as Baidu, Tencent, and Alibaba have not.

Back to Top

What is Using Power in a Datacenter?

According to a study from Procedia Environmental Sciences, 48% of the power in a datacenter goes to equipment such as servers and racks, 33% to HVAC (heating, ventilation, and air conditioning), 8% to UPS (uninterrupted power supply) losses, 3% to lighting, and 10% to everything else.

HVAC requires a delicate process of making sure hot air from server exhaust does not mix with cool air and raise the temperature of the entire datacenter. This is why most datacenters have hot and cold aisles. The goal is to have the cold air flow into one side of the racks, while the hot air exhaust comes out the other side. Optimizing air flow throughout the racks and servers is essential for HVAC efficiency.

Power comes off the grid as AC power. This can be single-phase, which has two wires (a power wire and a neutral wire); or three-phase, which has three wires, each 120 electrical degrees out of phase with each other. The key difference between the two is that three-phase power can handle higher loads than single-phase. The frequency of the power off the grid can be either 50Hz or 60Hz. Voltage is any of the following: 208V, 240V, 277V, 400V, 415V, 480V, or 600V.

Since most equipment in a datacenter uses DC power, the AC power needs to be converted. This results in power losses and wasted energy adding up to around 21%–27%. To break this down, there is a 2% loss when utility medium voltage, defined as greater than 1000V and less than 100 kV, is transformed to 480VAC; a 6%–12% loss within a centralized UPS because of conversions from AC to DC and DC back to AC; and a 3% power loss at the PDU (power distribution unit) level resulting from the transformation from 480VAC to 208VAC. Standard power supplies for servers convert 208VAC to the required DC voltage, resulting in a 10% loss, assuming the power supply is 90% efficient. This is all to say that power is wasted through-out traditional datacenters in transformations and conversions.

In an attempt to lessen the amount of wasted power from conversions, some people rely on high-voltage DC power distribution. The Lawrence Berkeley National Lab conducted a study in 2008 in which the use of 380VDC power distribution for a facility was compared with a traditional 480VAC power-distribution system. The results showed the facility using DC power eliminated multiple conversion stages resulting in a 7% decrease in energy consumption compared with a typical facility with AC power distribution. This is rarely done at hyperscale, however. Hyperscalers tend to have three-phase AC going to the rack, then convert to DC at the rack or server level.

Back to Top

More Power-Efficient Compute

In addition to RECs and using 100% renewable energy, there are other ways hyperscalers have made their datacenters more power efficient. In 2011, the Open Compute Project started out of a basement lab in Facebook's Palo Alto headquarters. Its mission was to design from a clean slate the most efficient and economical way to run compute at scale. This led to using a 480VAC electrical distribution system to reduce energy loss, removing anything in the servers that didn't contribute to efficiency, reusing hot aisle air in winter to heat the offices and the outside air flowing into the datacenter, and removing the need for a central power supply. The Facebook team installed the newly designed servers in the Prineville datacenter, which resulted in 38% less energy to do the same work as the existing datacenters. It also cost 24% less.

Let's dive into some of the details of the Open Compute designs that allow for power efficiency. The Open Rack design includes a power-bus bar with either 12VDC or 48VDC of distributed power to the nodes. The bus bar runs along the back of the rack vertically. It transmits power from the rack-level PSUs (power supply units) to the servers in the rack. The bus bar allows the servers to plug in directly to the rack for power, so when you service an Open Rack you do not need to unplug power cords; you can just pull the server out from the front of the rack. With the Open Compute designs, network connections to servers are at the front of the rack so the technician never has to go to the back of the rack (that is, the hot aisle).


One of the actions Google has taken for lowering its PUE is using machine learning to cool datacenters with inputs from local weather and other factors.


Redundancy. Conventional designs have PSUs in every server. The Open Rack design has centralized PSUs for the rack, which allow for N+M redundancy, the most common deployment being N+1. This means there is an extra PSU per rack of servers. In a conventional system this would be 1+1 since there is one extra PSU in every individual server. Keeping the PSUs centralized to the rack reduces the number of power-converting components; this increases the efficiency of the system.

Right-sized PSUs. Server designers tend to choose PSUs that have enough headroom to deliver power for the maximum configuration. Server vendors would rather carry a small number of oversized power-supply SKUs than a large number that are right-sized to purpose, since economies of scale prefer the former. This leads to an oversizing factor of at least two to three times the required capacity for conventional power supplies. In comparison, a rack-level PSU will be less oversized since it is right-sized for purpose. The hyper-scalers also have the advantage of economies of scale for their hardware. The typical Open Rack-compliant power supply is oversized at only 1.2 times the required capacity, if that.

Optimal efficiency. Every power supply has a sweet spot for load versus efficiency. The 80 Plus certification program measures PSU efficiency using these different grades: bronze, silver, gold, platinum, and titanium. The most power-efficient grade is titanium. The most common grade of PSU used in datacenters is silver, which has a maximum efficiency of 88%, meaning it wastes 12% electric energy as heat at the various load levels. In comparison, the 12V and 48VDC PSUs have data showing maximum efficiencies at 95% and 98%, respectively. This means the rack-level PSUs waste only between 5% and 2% of energy.

While the efficiency of the rack-level PSU is important, you still need to weigh the cost of the number of conversions being made to get the power to each server. For every unnecessary power conversion, you are paying an efficiency cost. For example, with a 48VDC rack-level power supply, the server might need to convert the rack provided from 48VDC to 12VDC, then that 12VDC to VCORE. VCORE is the voltage supplied to the CPU, GPU, or other processing core. With its 48VDC power supply, Google advocates for using 48V to PoL (point of load) to deliver power to the servers. This means placing a DC-to-DC or linear power-supply regulator going from the rack-level PSU to the server, which would reduce the number of conversions needed to get the power to the processing cores. The 48VDC-to-DC regulators required for Google's implementation, however, are not common and come at a premium cost. It is likely that Google's motivation for opening the specs for the 48VDC rack is to drive more volume to those parts and thus drive down costs. In contrast, 12VDC-to-DC regulators are quite common and low cost.

Back to Top

Reading a Power-Efficiency Graph

The accompanying figure is an example of a power-efficiency graph for a power supply. You can see that the peak of the graph is where the PSU is the most efficient. Divide the output power by the input power to calculate efficiency. The x-axis of the graph measures the load of the power supply in watts, while the j-axis measures efficiency.

If you know the peak load is 120W and idle is 60W, as shown in the figure, then this power supply would be more than is needed since it can handle up to 150W. At a peak load of 120W with 230VAC, this power supply would have a maximum efficiency of around 94% and a minimum efficiency at idle of around 92% with 230VAC. You now know the losses of this specific power supply and can compare it with other supplies to see if they are more efficient. This allows you to choose the right power supply for the load.

Open Compute servers without a bus bar. Not all Open Compute servers include a power-bus bar. Microsoft's Olympus servers require AC power. The Olympus power supply has three 340W power-supply modules, one for each phase, with a total maximum output of 1,000W. Therefore, these power supplies assume all deployments are three-phase power. The minimum efficiency of the PSU is 89%–94%, depending on the load, placing the grade of the Olympus power supply around an 80 Plus platinum.


With the Open Compute designs, network connections to servers are at the front of the rack so the technician never has to go to the back of the rack (that is, the hot aisle).


Like all technical decisions, using per-server AC power supplies versus rack-level DC is a trade-off. By having separate power supplies, different workloads can balance the power they are consuming individually rather than at a rack level. In turn, though, Microsoft needs to build and manufacture multiple power supplies to ensure they are right sized to run at maximum efficiency for each server configuration. Serviceability also requires technicians to unplug power cables and go to the back of the rack.

At the time Microsoft made the decision to use individual AC power supplies per server, the Open Rack design was at v1 (not v2 like it is today), the cost of the copper for the power-bus bar was higher, and the loss of efficiency to resistance was a factor. The Open Rack v1 design had an efficiency concern with power loss resulting from heating the copper in the bus bar. If a rack holds 24 kW of equipment, a 12VDC power-bus bar must deliver 2kA of current. This requires a very thick piece of copper, which has a significant power loss because of resistance in the bus bar.

Let's break down how to measure the relationship of power to resistance. Ohm's law declares electric current (I) is proportional to voltage (V) and inversely proportional to resistance (R), so V=IR. To see the relationship of power to resistance, combine Ohm's law (V=IR) with P=IV, which translates to power (P) being the product of current (I) and voltage (V). Substituting I=V/R gives P=(V/R)V=V2/R. Then, substituting V=IR gives P=I(IR)=I2R. So, P=I2R is how you can calculate the power loss resulting from resistance in the bus bar.

In making its decision, Microsoft balanced the conversion efficiency against the material cost of the bus bar and the resistive loss. Open Rack v2, however, changes the tradeoffs of the original decision. With a 48VDC bus bar, a rack that holds 24kW of equipment requires only 500A, as opposed to the 2kA required by the 12VDC powerbus bar from the v1 spec. This translates into a much cheaper bus bar and lower losses from resistance. The bus bar still has more loss than 208VAC cables, but there is an improved efficiency from the power-supply unit at the rack level, which makes it compelling. As stated earlier, however, you need to be mindful of the number of conversions needed to get the power to the components on the motherboard. If your existing equipment is 12VDC, you would want to avoid any extra conversions using that with a 48VDC bus bar. Save the 48VDC bus bar for new equipment that has 48V to PoL to avoid extra conversions.

uf2.jpg
Figure. Power efficiency graph example.

The main difference between Microsoft's design with individual power supplies and the 24VDC and 48VDC Open Rack designs is the way the initial power is delivered to the servers. Microsoft's design distributes three-phase power to the servers individually through power supplies, while the 24VDC and 48VDC power-bus bars distribute the power delivery to the servers. Once power is delivered to the server, it is typically sent through a DC-to-DC power-supply regulator, which in turn powers the components on the motherboard. This step is shared whether the power is coming from a single power-bus bar or individual power supplies.

Another interesting bit comes into play with UPSes. As noted earlier, there are losses in efficiency because of UPSes. What does this mean in terms of a DC bus bar or individual AC PSUs? When AC power is going into each individual server, you have two choices: a UPS on the AC before it gets distributed to the individual servers, or a UPS per server integrated into each server's PSU. Deploying and servicing individual batteries per server is a nightmare for maintenance. Because of this, most facilities that use AC power to the servers wind up using rack-wide or building-wide UPSes. Since the batteries in a UPS are DC, an AC UPS has an AC-to-DC converter for charging the batteries and a DC-to-AC inverter to provide AC power from the battery. For online UPSes, meaning the battery is always connected, this requires two extra conversions from AC to DC, and DC back to AC, with power-efficiency losses for both.

With a DC rack-level design, battery packs can be attached directly to the bus bar. The rack-level PSUs are the first AC-to-DC conversion state so there is no need for another conversion since everything from there runs on DC. The downside is that the rack-level PSU needs to adjust the voltage level to act as a battery charger. This means the servers need to accept a fairly wide tolerance on the 48V target, around +/-10V, so 40–56V isn't unreasonable. Because DC-to-DC converters are fairly tolerant about input voltage ranges, this is fairly straight-forward, without any significant loss in power efficiency. It's important to note that for hyperscalers UPSes are present only to allow for a generator to kick in—a few seconds rather than 10–15 minutes for a traditional datacenter.

With commodity servers, such as Dell or Supermicro, the cost of individual power supplies is much higher in terms of power efficiency since those PSUs do not have as high an 80 Plus grade and do have much more oversizing. They also tend to lack power-supply regulators that minimize power-conversion losses in supplying power to the components on the board. This would lead to around an 8%–12% gain in power efficiency by moving from a bunch of commodity servers in a rack to an Open Compute Project design—not to mention that the serviceability ease of the bus bar would benefit technicians as well.

By designing rack-level architectures, huge improvements can be made for power efficiency over conventional servers, since PSUs will be less oversized, more consolidated, and redundant for the rack versus per server. While the hyperscalers have benefited from these gains in power efficiency, most of the industry is still waiting. The Open Compute Project was started as an effort to allow other companies running datacenters to benefit from the power efficiencies as well. If more organizations run rack-scale architectures in their datacenters, the wasted carbon emissions caused by conventional servers can be lessened.

Acknowledgments. Thanks to Rick Altherr, Amir Michael, Kenneth Finnegan, Arjen Roodselaar, and Scott Andreas for their help with the nuances in this article.

q stamp of ACM QueueRelated articles
on queue.acm.org

Cooling the Data Center
Andy Woods
https://queue.acm.org/detail.cfm?id=1737963

Virtualization: Blessing or Curse?
Evangelos Kotsovinos
https://queue.acm.org/detail.cfm?id=1889916

Words Fail Them
Stan Kelly-Bootle
https://queue.acm.org/detail.cfm?id=1569209

Back to Top

Author

Jessie Frazelle is the cofounder and chief product officer of the Oxide Computer Company. Before that, she worked on various parts of Linux, including containers, and the Go programming language.


Copyright held by owner/author. Publication rights licensed to ACM.
Request permission to publish from [email protected]

The Digital Library is published by the Association for Computing Machinery. Copyright © 2020 ACM, Inc.


Comments


Alessandro Ratti

The base of the discussion in the article is "PUE" must be nearest to 1.0 as possible to have a better data-center.
PUE is basically a design parameter for the infrastructure of the data center, for sure lower is better, and 1.0 is the lower bound.
In theory, as soon as you design the data-center infrastructure with a specific PUE, any type of server boards, which fits into the data-center power envelope, will work; this board update possibly changes the final data-center computational capabilities, with the whole data-center still wasting the same amount of power.
But the article starts with discussion about how the data-center are becoming green, or, maybe better, how data-center owners want to say they are becoming green.
Using PUE to define how green is a data-centre is misleading: the denominator for the PUE value is "the energy used for servers" ( re-read energy going to the server CPU boards ), but the data center output is not "energy" but useful computation for the customer.
A Green-er data center must provide high output for same energy input: in the HPC a GREEN500 computer must have the highest value of GFlops/Watt ( the maximum now is about 21 ); a Green data-center must provide an highest customer useful computation for the give input power, and these number can be used for an effective "green" comparison ( SERT good starting point ? www.spec.org )
This value can be changed by changing the server boards, as already discussed above.
New technology advances enable good gain in computational efficiency, but many energy items in the final equation will not scale in the same way: for example, more powerful server boards typically need also faster or more topologically complex communication infrastructure.
To be green a data-center must be also well balanced is energy use when changing load conditions: less workload, the capability to shut off unused servers to save power; but this feature will also not scale ( a fully unused data-center is pure waste ).
Data center will use about 1% of the world energy ( https://science.sciencemag.org/content/367/6481/984 ) and any save is welcomed.

I want to add another input on the "FAANG" being carbon neutral now or later in the future : does, in the carbon balance, they include the carbon produced by building the data-center ? I do not know, but many times the calculation for being "carbon neutral" is related only to the operation of the facility ( energy in-out during facility lifetime ) with no consideration for the carbon cost of building and de-commissioning.
And, in general, how is the whole data-center business "green" ? how is the impact of building a new undersea cable ( see Marea https://news.microsoft.com/marea/ ) which is needed to support the data-center business ?